Our highland campus took on 18 – 24 inches of water during the flood in all of our buildings. The dry wall has been removed, wet furnishings disposed of and facilities have dried and dehumidified. Our staff worked diligently to set up office space in the training center for all our ABC staff and are thankful to be up and running.
|